Is a 24/7 SOC worth it?

Compare the cost of managed monitoring to the cost of an incident it prevents. Get your estimated return on investment in seconds.

Estimated return on investment

—

Get your profitability analysis

The full calculation and a comparison tailored to your size, by email.

The logical next step

Turn this calculation into concrete protection.

How this calculator works

You enter three numbers: the annual cost of the service you're considering (from a quote), the estimated cost of a major incident, and the probability of such an incident happening within a year.

The calculation compares two annual amounts: the risk without a SOC (probability multiplied by the incident cost), and the managed SOC cost you enter, taken from your quote. The assumption is that a SOC reduces realized risk by 60%: that avoided risk, minus the SOC's cost, gives the net gain and the ROI shown.

The formula: risk without a SOC = probability × incident cost. Risk avoided = 60% of that risk. Net gain = risk avoided − annual SOC cost. ROI = net gain ÷ annual SOC cost × 100.

The 60% risk-reduction rate is an assumption programmed into the tool, not drawn from an external study. The result is meant to compare a scenario; the cost of a managed SOC varies with the scope of service, hence the amount from your own quote.

Reading the result: a positive ROI doesn't mean "free", it means the risk avoided exceeds the cost of the service, based on your own numbers. If the probability or incident cost you entered are rough estimates, adjust them: that's the point of the calculator, not a number to take literally.

Frequently asked questions

Which SOC cost should I enter?

The annual amount from a quote you received. The price of a managed SOC depends on the scope of service: the tool assumes none.

Where does the 60% avoided risk come from ?

It's the assumption used in the calculation, a SOC that detects and responds early reduces realized risk, without bringing it to zero. It's not a published industry average.

What if my probability estimate is wrong ?

Change it, that's exactly why the field is adjustable. The result follows your assumptions, not ours.